Clear Lake HS

Video

Clear Lake Mr.Barker

Project

Purpose

Overview

Team

Status

Fabrication: 1/1 rear plate 30% complete, 0/1 door complete, 0/1 hinge complete, 1/1 front frame 40% complete, 0/2 top/bottom panel complete and 0/2 left/right side panel complete. Reference: 3 door panels are being made at Cy-Ranch on their CNC Router and 12 tool guides at Conroe HS

Assembly: 0% Door and 0% body complete.

Update 1/14/11

HUNCH Recognition Ceremony 2011

PowerPoint